COURT VISION
PROJECT TRACKER DEMO
Sky will walk you through a live project — with voice.
SKY
Building your project file...
BUILDING YOUR PROJECT FILE
1 OF 16
ENTITY
PROJECT NAME
PROJECT ADDRESS
SQUARE FOOTAGE
JOB COST
LEASING AGENT
GENERAL CONTRACTOR
ARCHITECT
ENGINEER (MEP)
LANDLORD
PROJECT MANAGER
CITY INSPECTION AGENCY
Once provided a permit and job number, Sky tracks the project directly on the city website.
SUBCONTRACTORS
DESCRIPTION OF WORK
ANTICIPATED COMPLETION
RENT COMMENCEMENT DATE

COURT VISION — PROJECT TRACKER

From concept to completion — Tenant Build Outs, Capital and Building Improvements

TENANT BUILD OUT

TAP ANY STAGE TO SEE WHAT HAPPENS  ·  ⚡ = STEAL / BLOCK RISK

Court Vision

That's the full lifecycle — from LOI to Rent Commencement. Before we talk next steps, let me show you exactly how this project performed. Cost, timeline, every delay, and what we'd do differently next time.

POST-PROJECT ANALYTICS
PROJECT PERFORMANCE SNAPSHOT
12,250 sq ft Tenant Improvement Build-Out — Final Project Report
FINAL COST / SQ FT
$120.56
After all change orders
Base contract was $114.00/sqft
TENANT DELIVERY
ON TIME ✓
Delivered 1 week ahead of
lease RCD stipulation (Wk 17 of 18)
TOTAL CHANGE ORDERS
$27,400
+5.7% over base contract
3 approved change orders
TOTAL DAYS DELAYED
24 Days
Recovered 7 days in construction
Net delay: 17 days vs original plan
FINAL COST BREAKDOWN — $512,400 TOTAL
TIMELINE: PLANNED vs ACTUAL (WEEKS)
⚡ RED FLAGS & DELAY BREAKDOWN
SUB BIDS — Day 23
Electrical subcontractor went dark 3 days past bid deadline. Sky escalated directly to the GC within 24 hours. A pre-qualified backup was activated immediately and the original sub resubmitted within 48 hours.
Impact: +0 days — contained with no timeline effect
PERMITTING — Day 45
City plan examiner returned drawings for HVAC load calculation revision — heat gain values did not meet city energy code requirements. Architect resubmitted corrected drawings with updated MEP engineer calculations within 8 business days.
Impact: +17 days — primary delay event on this project
FINAL INSPECTION — Day 91
Inspector flagged that HVAC equipment installed on site did not match the model number specified in the permitted engineering drawings. A field substitution was made during construction without an approved plan revision — triggering a mandatory re-inspection after record drawings were corrected.
Impact: +7 days — re-inspection passed on first attempt
💡 RECOMMENDATIONS — LESSONS LEARNED
01
SCHEDULE A PRE-PERMIT MEETING WITH THE CITY
A 30-minute pre-application meeting with the plan examiner before formal submission eliminates the most common rejection triggers — HVAC load calculations, occupancy classification errors, and exit path compliance. On this project, that meeting would have saved 12–17 days and approximately $4,200 in carrying cost. Sky flags this meeting as a mandatory step on every future permit submission.
02
EQUIPMENT SUBSTITUTION MUST TRIGGER RECORD DRAWING UPDATE
Any field substitution of permitted equipment — HVAC, electrical panels, plumbing fixtures — must trigger an automatic update to the record drawings before final inspection is scheduled. This single protocol eliminates re-inspection delays on virtually every project. Sky now enforces this as a change order checkpoint: no equipment substitution closes without a confirmed record drawing revision.
03
MAINTAIN A PRE-QUALIFIED BACKUP FOR HIGH-RISK TRADES
For electrical, HVAC, and structural trades — the three most common bid delays — maintaining a pre-qualified backup sub means any no-response past deadline can be activated within 24 hours instead of waiting on a single vendor. The sub bid delay on Day 23 was neutralized because a backup was already on file. Every project going forward starts with a backup trade list locked in at pre-con.
COURT VISION
WANT THIS REPORTING ON EVERY PROJECT?

Everything you just saw — the Court Vision dashboard, Sky coordinating every player in real time, red flag alerts, change order tracking, and this post-project analytics report — is your Court Vision plan, priced per active project and billed monthly until each project's deadline.

Fully customizable — built around your portfolio, your players, and your process.

✓  Court Vision dashboard on every active project
✓  Sky coordinating all parties — GC, architect, engineer, PM, tenant
✓  Real-time red flag alerts & change order tracking
✓  Post-project analytics & lessons learned reports
✓  Portfolio-level monthly reporting
✓  Custom workflows built for your specific deal process
Priced per project

Court Vision is quoted per build, not sold as a monthly plan — the number depends on the size of the project and who is on your court. Bring your next build to a call and we will scope it together.

Sky is walking you through the most important questions...

READY TO RUN THE PLAY?

For this process to move forward efficiently and expeditiously, all required documentation must be submitted upfront. The moment your documents are in, I start coordinating with every player immediately.

🎬
CINEMATIC PROJECT RECAP

Throughout the entire build-out process, photos and project milestones are uploaded and automatically organized into a professional branded recap video — showing the full journey from demo day to completed tenant space. The final video functions as a marketing asset with your brand, your build, and your win.

📋
SUBMIT DOCS FIRST
Plans, lease exhibit, and conditions report submitted upfront allow me to build the full timeline and notify every stakeholder on day one.
🤝
SKY COMMUNICATES FOR YOU
I am the one talking to your PM, GC, architect, inspector, permit office, and every sub — throughout the entire process. You never chase anyone.
🏆
RCD ON TIME
The fastest path to Rent Commencement starts with complete documentation. Incomplete files cause delay. Complete files close deals.